Pack informationsPack photosPack informationBMS informationBatch information2nd Life informationProcessProcess 2nd Life batch B1 (Lime/Jump Batch 1)RankingStatisticsCell counting spreadsheetStorage statisticsTiming statisticsCost statisticsPack opening machineJournal13/12/22 - Test of a few packs, CAN comm, first stats20/12/22 - Timing, thoughput and cost calc22/12/22 - Stats on first Chantal runs, CP1 vs CC1 vs DC1 comparison23/12/22 - CP1 not satisfying, cells for Innov8, process launch for Christmas04/01/23 - Stats tested cells to date, Chantal speed improvement, Chantal / Neware inaccuracy, PRETEST TEST IMPEDANCE AND TEST CAPA parameters settlement12/01/23 - First time TEST IMPEDANCE of cells13/01/23 - First time STORAGE18/01/23 - 2A and 2.5A charge tests26/01/23 - broken cylinder on dismantling30/01/23 - EEPROM parameters for B1Todo
Pack informations
Pack photos
Add photos of the pack, closed and opened
Photo of battery sticker
Pack information
Fill ALL the above page informations when available
Spec sheet?
BMS information
Add photos of the BMS
MOSFET model:
MOSFET number:
BMS IC:
BMS schematic?
BMS protocol?
Batch information
Fill reception date, quantity, storage location… in the page information above
Add photos of packing, storage…
2nd Life information
Process
Process 2nd Life batch B1 (Lime/Jump Batch 1)
Ranking
MH1 Lime Paris Batch 1 (B1) groups
Calculation sheet: https://docs.google.com/spreadsheets/d/1TuuIm-0GdV_EQu69d_A6GCtDdedZa1q7XGSWONm9tGA/edit#gid=0
90-91 | C10R1 | C10R2 | C10R3 | C10R4 | C10R5 |
91-92 | C9R1 | C9R2 | C9R3 | C9R4 | C9R5 |
92-93 | C8R1 | C8R2 | C8R3 | C8R4 | C8R5 |
93-94 | C7R1 | C7R2 | C7R3 | C7R4 | C7R5 |
94-95 | C6R1 | C6R2 | C6R3 | C6R4 | C6R5 |
95-96 | C5R1 | C5R2 | C5R3 | C5R4 | C5R5 |
96-97 | C4R1 | C4R2 | C4R3 | C4R4 | C4R5 |
97-98 | C3R1 | C3R2 | C3R3 | C3R4 | C3R5 |
98-99 | C2R1 | C2R2 | C2R3 | C2R4 | C2R5 |
>99% | C1R1 | C1R2 | C1R3 | C1R4 | C1R5 |
SOH / IR 3.6V | < 32 | 32-33 | 33-34 | 34-35 | 35-37 |
Statistics
To complete
Cell counting spreadsheet
Storage statistics
Timing statistics
Cost statistics
Pack opening machine
Journal
13/12/22 - Test of a few packs, CAN comm, first stats
20/12/22 - Timing, thoughput and cost calc
22/12/22 - Stats on first Chantal runs, CP1 vs CC1 vs DC1 comparison
23/12/22 - CP1 not satisfying, cells for Innov8, process launch for Christmas
04/01/23 - Stats tested cells to date, Chantal speed improvement, Chantal / Neware inaccuracy, PRETEST TEST IMPEDANCE AND TEST CAPA parameters settlement
12/01/23 - First time TEST IMPEDANCE of cells
13/01/23 - First time STORAGE
18/01/23 - 2A and 2.5A charge tests
26/01/23 - broken cylinder on dismantling
30/01/23 - EEPROM parameters for B1
Todo
Accélérer programme Chantal
Refaire les ranges de capa
Refaire les ranges d’IR
Rejets, comment faire ?
Tableau C1R2…
Passer une MH1 neuve sur Chantal
Refaire le programme du PRETEST
Tableau comptage de bacs
Plus de bacs verts dans zone travail. Que stockage
Préparer bacs
Table roulante pour charger / décharger les machines ⇒ https://www.amazon.fr/Informatique-roulettes-Ordinateur-Portable-Réglable/dp/B09H5SY7LP/
Installer les thermomètres
Problème scotch sur cellules ?
Comment régler le SOH initial lors de la fabrication des batteries ?
Finir process, imprimer. Diagramme
Notes nettoyage cells. Photo, OK / pas OK
- Nettoyage cells
Table roulettes pour charger/décharger Chantal
Mettre des marquages dans la zone. Etagère de stockage temporaire prête ? Mettre des étiquettes et des règles pour le stockage de bacs de cellules NOK aussi. Mieux répartir les C1 à C10
Faire un coup de propre sur cette page, faire des chapitres. Faire un template, ajouter les catégories, un lien vers la page de la cell, etc
Coupure à distance de la machine avec un servo + Arduino. Terminal, renvoie le statut toutes les 10sec (ON ou OFF). Envoi d’une commande pour OFF. Le servo revient à sa place. Comment détecter le statut ON ? SikuliX. Détecter le 1 finished. Si c’est le soir, tempo puis coupure. Le faire une seule fois. Ecrire dans un fichier log l’heure de coupure. Détecter le statut ON quand il voit 1 CV (ignorer temps à côté) ?
Commander boites supplémentaires
Virer des EVE, faire de la place. Pareil BD. Mettre des MH1 à cycler. ET DEMARRER LES PARTIAL !!!
Ventilation… VMC vers 2nd batiment ?
- Affûter lame ?
- Trouver une façon + efficace de charger Chantal depuis les bacs ? On met environ 8 min par côté (256 cells) à la main
Faire cale impression 3D pour les étagères de Chantal, les réglages bougent parfois